Scaffolding was built today to enable the in-situ restoration during the summer of the historic 1700s tie beams of the Roslyn Grist Mill. The entire structure was lowered 3 1/2 feet to street level to enable the safe restoration and re-installment of the timber frame.
Tags
Related Profiles
0 Comments