The 40-ton Roslyn Grist Mill structure was lowered 3 1/2 feet on Thursday returning the entrance to street level for the first time in over 100 years. The lowering was made possible with the completion of the new foundation in November 2021 and will facilitate the restoration of the timber frame onsite next month.
Here are several dramatic "Before" and "After" images.
Front View
Doorway
Side View
Tags
Related Profiles
0 Comments